|
|
|
Item Details
Title:
|
ICE CONDITIONS OF CONTRACT GROUND INVESTIGATION VERSION
CONDITIONS OF CONTRACT AND FORMS OF TENDER, AGREEMENT AND BOND FOR USE IN CONNECTION WITH GROUND INVESTIGATION : GROUND INVESTIGATION VERSION |
By: |
Institution of Civil Engineers |
Format: |
Paperback |
List price:
|
£25.00 |
We believe that this item is permanently unavailable, and so we cannot source
it.
|
|
|
|
|
ISBN 10: |
0727732269 |
ISBN 13: |
9780727732262 |
Publisher: |
ICE PUBLISHING |
Pub. date: |
1 November, 2003 |
Edition: |
2nd Revised edition |
Pages: |
96 |
Description: |
Based on the traditional pattern of an investigation designed by a Engineer and carried out by a Specialist Contractor. This investigation includes: Site operations including drilling, digging pits, surveys; Ancillary Works, being permanent items left behind; Laboratory Testing; and Reporting requirements. |
Synopsis: |
Like the measurement version of the "ICE Condition of Contract", the "Ground Investigation Version" is based on the traditional pattern of an investigation designed by a Engineer and carried out by a Specialist Contractor. These Conditions are intended for the situation where the Employer wishes to develop a site and has geotechnical specialists to advise him and who will carry out any initial desk study, identify the geotechnical requirements of the project and design a ground investigation to suit those requirements. The Investigation may include all or some of the following: Site operations including drilling, digging pits, surveys etc; Ancillary Works, being permanent items left behind, e.g. piezometers; Laboratory Testing; and Reporting requirements. The extent of these will vary depending on the needs of individual projects and whether the purpose is for feasibility study of a full design investigation. This new edition maintains the concepts set down in the first edition, published in 1983, but puts them in a more modern context with some additions and amendments resulting from experience and modern practice.Changes since the first edition include: improved clarity of language, as for the family of ICE contractors; provision for a Ground Specialist to act as Engineer (Clause 2(2)); provisions regarding sub-contractors (Clause 4); requirements for supply of site information by the Employer (Clause 11); a procedure for dealing with unforeseen contamination (Clause 12A); a provision for repeating defective work (Clause 49(4)); a provision for dealing with Contractor proposed variations(Clauses 51(3) and 52(2)); and amended retention money clauses (Clause 60(5)and (6)). |
Publication: |
UK |
Imprint: |
Thomas Telford Ltd |
Returns: |
Non-returnable |
|
|
|
|
|
|
|
|
|
Little Worried Caterpillar (PB)
Little Green knows she''s about to make a big change - transformingfrom a caterpillar into a beautiful butterfly. Everyone is VERYexcited! But Little Green is VERY worried. What if being a butterflyisn''t as brilliant as everyone says?Join Little Green as she finds her own path ... with just a littlehelp from her friends.
|
|
All the Things We Carry PB
What can you carry?A pebble? A teddy? A bright red balloon? A painting you''ve made?A hope or a dream?This gorgeous, reassuring picture book celebrates all the preciousthings we can carry, from toys and treasures to love and hope. With comforting rhymes and fabulous illustrations, this is a warmhug of a picture book.
|
|
|
|